The Local Plan, site HS3

HS3: Former Westerleigh School

Maze Hill ward, Hollington Park Road. From Appendix 1 Draft Local Plan - Pre Submission (Regulation 19) September 2026 ↗, Full Council, Wed 23 Sep 2026.

Representations on the plan closed on Thursday 12 November 2026, the date on the council’s consultation page: Draft Local Plan Regulation 19 stage ↗.

For
Residential
Minimum Indicative Capacity (net additional dwellings)
100
Site area
2.15 hectares
Density
45-55 dwellings per hectare
SHELAA reference
HL10
Hollington Park RoadFormer Westerleigh School (at least 100 homes)
Placed at the middle of Hollington Park Road, the former school's address (the government's register of schools). The site's exact boundary is on the council's Policies Map ↗.

What the plan says about it

Former Westerleigh School provides an opportunity for redevelopment of the former school site.

The topography of the land, the existing mature trees within the site and important nature conservation issues will need to be explored in any scheme that is put forward for this site.

The rest of the plan's explanation (2 more paragraphs)

The site, given its size and location, will be expected to support a varied housing mix and affordable housing will also be required. Of particular importance for this site will be measures to reduce surface water flood risk, and Sustainable Drainage Systems are likely to be required. Connections between the green space protected on site and those existing green spaces off site will also need to be shown on any application to ensure the conservation and enhancement of the green infrastructure network.

The site will require vehicular access to the site that is developed to an adoptable standard. The potential vehicular access does not need to follow the line of the existing road and can consider land to the south of the existing access.

What a planning application here would have to do

The policy's conditions, as the plan words them:

  1. Provide affordable housing requirement in line with Policy SP2
  2. Be informed by slope stability reports and a geotechnical report due to the site topography
  3. Maintain existing green corridors or replace them with comparative new green corridors
  4. Be supported by an Ecological Impact Assessment (EcIA) and include an Ecological Constraints and Opportunities Plan (ECOP) and incorporate appropriate conservation and mitigation measures as recommended by the EcIA. The ECOP must make specific reference to surveys of the site itself and to other nearby areas of wildlife sensitivity.
  5. Construct vehicular access to the site to an adoptable standard
  6. Include walking and cycling links to improve local connectivity, including to local community infrastructure, green spaces and public transport provision, taking into account site topography
  7. Take account of Southern Water's underground infrastructure in the design of the layout of the site. Easements would be required, which may affect the site layout or require diversion, and these should be clear of all proposed buildings and tree planting
  8. Provide an Arboriculture Plan that demonstrates how existing trees and proposed new trees on the site will be integrated into the development.

On the brownfield register

The council's brownfield register lists this land too. The register is the council's statutory list of brownfield land suitable for housing. The Local Plan is still a draft.

From Hastings Borough Council's Brownfield Land Register ↗ (published March 2025), its statutory register of brownfield land suitable for housing, read on 12 October 2026. Being on the register grants no planning permission. Every site on the register

What people said in the spring

In the spring 2026 consultation on the draft plan (called Regulation 18), 6 comments were made on this site: 2 objections, 1 in support and 3 other comments.

How to respond

The council’s consultation on this stage has closed. Its timetable for what happens next is on our Local Plan page.

Other council papers that mention it

Read from the plan ↗ and the spring consultation report ↗ with fixed rules, and no language model is involved. The plan's text is what counts.