This appendix sets out the Foreshore Trust's business plan spending plan for maintenance and cyclical repairs from 2025-26 to 2029-30. p6

The total programme is estimated at £1,627,869 over the five years, including £1,502,869 for maintenance and cyclical repairs and £125,000 contingency. p6

For 2025-26 the total programme budget is £247,110, including £222,110 for maintenance and cyclical repairs. p6

Planned items include routine maintenance of the car parks at Pelham and Rock-a-Nore, and external redecoration and drainage maintenance at White Rock Baths. p1p3

Show the 3 passages this is based on
  • p1Business Plan - Foreshore Trust Spending Plan 2025-2030 Appendix 3 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Maintenance Item Description Budget ESTIMATE ESTIMATE ESTIMATE ESTIMATE Total £ £ £ £ £ Coastal Works - Contingency Urgent responsive repairs to assets if damaged 16,050 15,000 16,200 17,496 18,896 83,642 Car Parks - Pelham Routine maintenance 6,000 6,000 6,000 6,000 6,000 30,000 Car Parks - Rock-a-Nore Routine maintenance 6,000 6,000 6,000 6,000 6,000 30,000 Beach Huts - White Rock Routine maintenance 5,350 5,000 5,350 5,725 6,125 27,550 Former Lifeguard and Cycle Hire Huts Routine maintenance 0 3,000 0 3,675 0 6,675 Former Lifeguard and Cycle Hire Huts Roof maintenance 4,000 0 0 0 4,900 8,900 Car Parks - Pelham Tarmac surfacing - routine minor maintenance 0 2,000 2,000 0 2,000 6,000 Car Parks - Pelham Clearance of drainage gullies and channels 1,000 0 0 1,000 1,000 3,000 Car Parks - Pelham Main access routes and disabled parking space hatching road markings - re-application 0 3,000 0 0 0 3,000 Car Parks - Pelham Parking bay road markings - re-application 0 0 3,000 0 0 3,000 Car Parks - Pelham Traffic speed humps - repair / replacement 0 0 0 6,000 0 6,000 Car Parks - Pelham Vehicle height barrier at entrance - Maintenance 3,000 3,000 3,000 3,000 3,000 15,000 Car Parks - Pelham Car park lighting columns - maintain LED lamps 500 500 500 500 500 2,500 Car Parks - Pelham Car park information and direction signage 500 500 500 500 500 2,500 Car Parks - Pelham Installation of additional public electric car charging points 0 10,000 0 0 0 10,000 Car Parks - Pelham Public pay and display ticket machines (4 no.) 0 10,000 0 0 0 10,000 Pelham Playa (netted MUGA) Replacement of roof netting system 0 15,000 0 0 0 15,000 Pelham Playa (netted MUGA) Routine maintenance 6,420 6,000 6,420 6,869 7,350 33,060 Pelham Playground Repair of play proprietory play equipment 5,350 5,000 5,350 5,725 6,125 27,550 Pelham Playground Resurfacing 0 0 0 0 15,000 15,000 Play Areas and Exercise Equipment Maintenance of equipment 16,050 15,000 16,050 17,174 18,376 82,649 Exercise Equipment Replacement / repair of equipment 2,675 2,500 2,675 2,862 3,063 13,775 Wayfinding - Seafront Finger Posts Redecoration and repair 500 0 0 500 500 1,500 Public Conveniences Routine maintenance 6,000 6,000 6,000 6,000 6,000 30,000 Rock-a-Nore Car Park - Hard Surfaced Clean out car park drainage gullies and channels 0 1,000 1,000 0 1,000 3,000 Rock-a-Nore Car Park - Hard Surfaced Heritage surfaced section - patch repair of worn areas mostly to main access route. page 1 ↗
  • p3Business Plan - Foreshore Trust Spending Plan 2025-2030 Appendix 3 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Maintenance Item Description Budget ESTIMATE ESTIMATE ESTIMATE ESTIMATE Total Rock-a-Nore Car Park - Hard Surfaced Car park lighting columns - maintain LED lamps 500 500 500 500 500 2,500 Rock-a-Nore Car Park - Hard Surfaced Car park information and direction signage 500 500 500 500 500 2,500 Rock-a-Nore Car Park - Hard Surfaced Public pay and display ticket machines (4 no.) 0 10,000 0 0 0 10,000 Rock-a-Nore Car Park - Loose Surface Scarify and fill pot holes in loose surface finish 14,000 13,000 15,000 16,000 17,000 75,000 Rock-a-Nore Car Park - Loose Surface Replacement of damaged timber bollards 1,000 0 0 1,000 1,000 3,000 Rock-a-Nore Car Park - Loose Surface Repair timber kerb baulks to south boundary 0 2,000 0 0 0 2,000 Rock-a-Nore Car Park - Loose Surface Replace timber kerb baulks to south boundary 0 0 30,000 0 0 30,000 Stade Hall - exterior Quarterly roof/gutter clearance & A/C service 2,500 2,500 2,500 2,500 2,500 12,500 Stade Barriers Annual maintenance 5,000 5,000 5,000 5,000 5,000 25,000 Stade Hall & Stade Public Conveniences Main elevations - external redecoration 0 0 6,000 0 0 6,000 Stade Open Space Drainage gulley clearance 535 500 535 572 613 2,755 Stade Open Space bespoke Stade benches redecoration and shingle clearance 0 0 3,000 0 0 3,000 Stade Open Space Automatic bollard and barrier replacement 0 0 25,000 0 0 25,000 Stade Public Conveniences Interior spaces - internal redecoration 6,000 0 6,000 0 0 12,000 White Rock Fountain Maintenance & operation 8,560 8,000 8,560 9,159 9,800 44,080 White Rock Baths External redecoration/ Building maintenance 14,980 14,000 14,980 16,029 17,151 77,139 White Rock Baths - Lower Basement Lower basement drainage - Maintenance 10,700 10,000 10,700 11,449 12,250 55,099 White Rock Baths - Lower Basement Lower basement drainage - Contract costs 10,700 10,000 10,700 11,449 12,250 55,099 White Rock Baths - Lower Basement Sewage tank and pump set - maintenance 3,210 3,000 3,210 3,435 3,675 16,530 White Rock Baths - Lower Basement Sewage tank pump set & controls - replacement 0 0 5,000 0 0 5,000 White Rock Baths - Prom Entrance Superstructure. page 2 ↗
  • p6Business Plan - Foreshore Trust Spending Plan 2025-2030 Appendix 3 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Maintenance Item Description Budget ESTIMATE ESTIMATE ESTIMATE ESTIMATE Total White Rock - Landscaping Planned grounds maintenance 0 3,000 540 583 630 4,753 Pelham - Landscaping Planned grounds maintenance 0 1,910 324 350 378 2,962 Pelham - Planters Planned grounds maintenance 0 1,200 1,296 1,400 1,512 5,407 Boating Lake - Landscaping Planned grounds maintenance 0 4,650 1,350 1,458 1,575 9,033 Stade Open Space - Lighting Renewal of amenity lighting system 0 35,000 0 0 0 35,000 Stade Open Space - Lighting Maintenance of amenity lighting system 5,350 5,000 5,350 5,725 6,125 27,550 Stade Open Space - Pop-up power points Renewal of power infrastructure system 0 35,000 0 0 0 35,000 Stade Open Space - Pop-up power points Maintenance of power infrastructure system 5,350 5,000 5,350 5,725 6,125 27,550 Stade Area - Bollards/Railings Routine maintenance & repairs 5,350 5,000 5,350 5,725 6,125 27,550 Foreshore Trust Land - Signage Routine maintenance & repairs 5,350 5,000 5,350 5,725 6,125 27,550 Foreshore Trust Land - Surfacing Routine maintenance & repairs 10,700 10,000 10,700 11,449 12,250 55,099 Seasonal beach huts Routine maintenance & repairs 1,000 1,000 1,145 1,225 16,000 20,370 White Rock Baths - Lower Basement and Main and Small Hall LevelsSurvey and report of concrete structures 0 0 8,000 0 10,000 18,000 White Rock Baths - Lower Basement and Main and Small Hall LevelsHealth and safety repairs of concrete structures 0 15,000 25,000 0 30,000 70,000 Stade Beach (Fishermens) Floodlighting Routine maintenance 2,700 2,500 2,920 3,155 3,410 14,685 Promenade Railing repairs to sailing club area 5,000 5,500 6,000 16,500 Total Maintenance & Cyclical Repairs 222,110 383,620 335,965 247,096 314,078 1,502,869 Contingency Project Work Contingency 25,000 25,000 25,000 25,000 25,000 125,000 Total Projects - Main Programme TOTAL PROGRAMME 247,110 408,620 360,965 272,096 339,078 1,627,869 page 3 ↗