What it recommends

In the report's words. A recommendation is a proposal, and the meeting can agree, change or reject it.

What the meeting decided

The minutes record: Agreed. “RESOLVED to: 1) approve the Sussex-wide approach to preparing a new statutory Minerals and Waste Plan in partnership with West Sussex County Council, Brighton & Hove City Council and the South Downs National Park Authority; and 2) delegate authority to the Director of Communities, Economy and Transport to prepare, carry out and publish responses to the Scoping Consultation; and prepare and submit information required to pass through Gateway 1 of the plan making process.” minutes ↗

In plain English

Each sentence was checked against the passage it cites. How the checking works.

Recommended · This went to the meeting on Mon 16 Nov 2026. What was decided is in that meeting's minutes.

The new Sussex Minerals and Waste Plan would be prepared under regulations that came into force in March 2026, and is intended to fully replace the current East Sussex, South Downs and Brighton & Hove Waste and Minerals Local Plan. p8p12p29

Lead Member approval would be sought separately before the plan is published for consultation and before it is submitted for formal examination, with adoption by Full Council anticipated in autumn 2029. p49p50

We’ve left out 2 more sentences of this summary because they didn’t pass our check against the paper.

Show the 5 passages this is based on
  • p81 Background 1.1 East Sussex County Council is a Minerals and Waste Planning Authority. On the 25 March 2026, the Town and Country Planning (Local Planning) (England) Regulations 2026 (the Regulations) came into force. The Regulations require Minerals and Waste Planning Authorities to prepare one or more documents, known collectively as their ‘Minerals and Waste Plan’. The Regulations will apply to joint plan-making and address procedural matters regarding joint local plans, including joint minerals and waste plans. The Regulations set out in detail the key steps to be taken to proceed with plan-making and introduce a new 30-month timescale in which to prepare and adopt a Minerals and Waste Plan. page 1 ↗
  • p121.5 There are currently 3 development plan documents that form the Minerals and Waste Plan for East Sussex, the plan period for which is 2019 to 2030. These were prepared and adopted jointly by East Sussex County Council, Brighton & Hove City Council and the South Downs National Park Authority and are known collectively as the ‘East Sussex, South Downs and Brighton & Hove Waste and Minerals Local Plan’ (“the Waste and Minerals Plan”). page 2 ↗
  • p292.11 The Notice would provide the names of the joint authorities preparing the Plan; the Plan Area (Appendix 1); the title of the Plan; where the Timetable is published; confirm that the SMWP will fully replace existing Minerals and Waste Plans; and the date on which the Notice is made available. For a joint Minerals and Waste Plan, the Notice of Intention to Commence must also identify each of the other Minerals and Waste Planning Authorities whose areas the joint Plan will cover. The Notice does not set out proposed policy being considered for the Plan. page 4 ↗
  • p492.23 Lead Member approval is required to publish a draft SMWP prior to both rounds of consultation. Lead Member approval for the submission for formal examination will be sought separately and at the appropriate time. page 6 ↗
  • p502.24 Following examination, the SMWP will need to be adopted by Full Council, which is anticipated to be in autumn 2029. page 6 ↗