Noted · Received for information; no decision followed.
Appendix 3 summarises the changes made as part of the 2026 review that replaced PS 7/2 Highway Verges and Vegetation with the new Highway Vegetation Management Policy. p1
The policy is renamed and restructured around the management of highway vegetation, introduces an explicit proportionate, risk-based approach, and states that highway safety and serviceability take priority where they conflict with environmental or amenity designations. p11p17p26
The principal substantive change is a new policy basis allowing the Council to use the Capital Asset Value for Amenity Trees (CAVAT) methodology and recover that value from a third party where a highway tree is removed or permanently damaged to facilitate development, with replacement planting determined through the Council's Tree Planting Guidance. p41p42
The policy also adds Section 154 notices under the Highways Act 1980 for third-party vegetation causing or likely to cause an obstruction or safety risk. p47
Show the 7 passages this is based on
- p1Appendix 3 Summary of Changes This appendix outlines the specific updates or modifications made to PS 7/2 Highway Verges and Vegetation as part of the 2026 review and its replacement with the Highway Vegetation Management Policy. page 1 ↗
- p11Renamed Highway Vegetation Management Policy and structured around the management of highway vegetation. page 1 ↗
- p17Introduces a proportionate, risk-based approach and aligns the policy with the Highway Infrastructure Asset Management Policy and Strategy. page 1 ↗
- p26States that highway safety and serviceability take priority where they conflict with environmental or amenity designations and allows additional or alternative maintenance where necessary. page 2 ↗
- p41Allows the Council to use the Capital Asset Value for Amenity Trees (CAVAT) methodology and recover that value from a third party where a highway tree is removed or permanently damaged to facilitate development or approved highway works. Replacement planting is determined through the Council’s Tree Planting Guidance. page 3 ↗
- p42Principal substantive change. Establishes a formal policy basis for CAVAT and replacement planting where highway trees are affected by development. page 3 ↗
- p47Retains third-party authorisation, clarifies approval and licensing requirements, and adds use of Highways Act 1980 Section 154 notices where third-party vegetation causes or is likely to cause an obstruction or safety risk. page 4 ↗
Places and organisations it names
Other papers for this meeting
- Lead Member for Transport and Environment agenda
- Appendix 1 to item 12, Lead Member for Transport and Environment
- Appendix 1 to “Appendix 4.”
- Appendix 2 to item 12, Lead Member for Transport and Environment
- Appendix 2 to “Appendix 4.”
- Appendix 4.
- Decisions made by the Lead Cabinet Member on 20 July 2026
- Highway Vegetation Management Policy - Review
- Pan-Sussex Minerals and Waste Plan Proposal
- Lead Member for Transport and Environment minutes (draft)