For decision · This went to the meeting on Wed 9 Sep 2026. What was decided is in that meeting's minutes.

It also describes a carbon monoxide incident on 2 December 2025 after a generator was used inside the premises without staff present, after which residents were evacuated and some required hospital treatment. p48

3 further sentences of this summary were held back by verification and are not shown. We only publish claims that survived checking against the cited passages.

Show the 1 passage this is based on
  • p48On 2 December 2025, a serious incident occurred that had the potential to result in significantly more severe consequences had residents not acted promptly. Following the disconnection of the property's mains electricity supply, a generator was being used inside the premises. The generator was left running while no staff members were present, resulting in a carbon monoxide incident. Consequently, residents were evacuated from the building, and several individuals required hospital treatment.