42 Bexleigh Avenue

Planning application HS/FA/26/00086

42 Bexleigh Avenue, St Leonards-on-sea, TN38 8BB

Extensions and alterations

What is proposed

In the council’s words, from its weekly list:

Proposed part-single part two-storey rear extension

Where it stands

The council’s file ↗

Conditions attached

The decision notice on the council’s file (published Mon 1 Jun 2026) attaches 8 conditions. In the council’s words, each with the reason it gives:

  1. Time limit to start
    The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

    Reason: This condition is imposed in accordance with the provisions of Section 91 of the Town and Country Planning Act 1990.

  2. Built to the approved plans
    The development hereby permitted shall be carried out in accordance with the following approved plans: P01 P02 P03A P04A P05A P06A

    Reason: For the avoidance of doubt and in the interests of proper planning.

  3. Something else
    Prior to commencement of the development hereby approved a site investigation, commensurate with the scale and nature of the proposed development shall be submitted to and approved in writing by the Local Planning Authority. The investigation shall, as a minimum, include trial pits which shall: a) include in-situ observation of soils by an appropriately qualified and demonstrably experienced geotechnical engineer or engineering geologist; b) confirm the depth and condition of existing foundations and underlying ground conditions; c) determine the presence or absence of shallow groundwater; and d) enable appropriate geotechnical parameters to be derived for the design of the proposed foundations. The development shall thereafter be carried out in accordance with the approved details.

    Reason: To ensure that the construction takes account of the local ground conditions and the sloping nature of the site.

  4. Something else
    Prior to commencement of the development hereby approved a factual and interpretative geotechnical design report shall be submitted to and approved in writing by the Local Planning Authority. The report shall include: a) assessment and commentary on the anticipated stability of the post-development slope profile; and c) consideration of site-specific ground conditions, groundwater conditions, the proposed development, construction methods, and imposed loading. The development shall thereafter be carried out in accordance with the approved details.

    Reason: To ensure that the construction takes account of the local ground conditions and the sloping nature of the site.

  5. Something else
    Prior to commencement of the development hereby approved detailed engineering calculations shall be submitted to and approved in writing by the Local Planning Authority demonstrating that the proposed foundation scheme, proposed temporary works, propping arrangements, construction sequencing and any required slope retention have considered both loading from the proposed structures and any lateral loads imposed by the existing / neighbouring buildings. The development shall thereafter be carried out in accordance with the approved details.

    Reason: To ensure that the construction takes account of the local ground conditions and the sloping nature of the site.

  6. Something else
    Prior to commencement of the development hereby approved detailed engineering calculations shall be submitted to and approved in writing by the Local Planning Authority demonstrating that the proposed foundation scheme, proposed temporary works, propping arrangements, construction sequencing and any required slope retention have considered both loading from the proposed structures and any lateral loads imposed by the existing / neighbouring buildings. The development shall thereafter be carried out in accordance with the approved details.

    Reason: To ensure that the construction takes account of the local ground conditions and the sloping nature of the site.

  7. Materials and design details
    The materials to be used in the construction of the external surfaces of the extension hereby permitted shall match those used in the existing building.

    Reason: To ensure that the finished extension matches the appearance of the existing dwelling.

  8. Hours of building work
    With the exception of internal works the building works required to carry out the development allowed by this permission must only be carried out within the following times:- 08.00 - 18.00 Monday to Friday 08.00 - 13.00 on Saturdays No working on Sundays or Public Holidays.

    Reason: To safeguard the amenity of adjoining and future residents.

We copy the numbered conditions and their reasons and nothing else from the notice; its notes to the applicant are on the file. The label on each is ours, by rules on the council’s wording. The conditions the council attaches, by kind of application

Conservation and heritage on this street

None of the town’s 18 conservation areas reaches Bexleigh Avenue as mapped.

Measured along the street’s line against the council’s boundaries. Whether a particular building is inside depends on where the boundary runs: each area’s page on the council’s site has its map. All 18 conservation areas

The council’s Article 4 direction on houses in multiple occupation covers the whole town (in force since 2 July 2012): turning a house into a shared house for three to six people needs planning permission. The council’s page ↗

Conservation areas, Article 4 directions and tree preservation orders: Hastings Borough Council, Open Government Licence v3.0. Street lines © OpenStreetMap contributors.

Flood zones, the coast and protected nature on this street

We place an application by the street in its address, so these say where Bexleigh Avenue runs, not where the site’s boundary is. The application’s own documents on the council’s file show the site.

Flood zones

None of Bexleigh Avenue’s line is in Flood Zone 2 or 3 on the Environment Agency’s flood map for planning. In the Agency’s words: “This means a site in flood zone 1 could still flood now or in the future.”

A street’s line is not an address. For a particular address, use the Environment Agency’s Check your long term flood risk ↗; for a planning site, its Flood map for planning ↗. Flood warnings in force now are on Live now.

The coast

The Environment Agency’s erosion map covers this frontage: 2 stretches of policy unit 4C25 Bulverhythe and Glyne Gap ↗ in the Shoreline Management Plan, whose policy is Hold the line (Maintain/replace) in all three periods, 2005 to 2105: “Where protection is currently provided by coastal defence structures or managed beaches, and the intention is to retain a defence along approximately the current alignment. This will involve replacing defences when needed. Defence type, method and standard of protection may be modified over time.”

Part of Bexleigh Avenue’s line is inside the map’s No Future Intervention zone to 2105, and none of it inside the zone to 2105 with the plan delivered.

The figures are the width of the map’s erosion zone, inland from today’s shoreline, on the Higher Central allowance. In the Agency’s words: “Two periods: Medium Term (up to 2055) and Long Term (up to 2105).” “Two management scenarios: With Shoreline Management Plans delivered and No Future Intervention.” “Three climate scenarios: Present Day climate (2020), Higher Central allowance and Upper End allowance. The two allowances use sea level rise data from UKCP18 RCP8.5 70th and 95th percentiles respectively.” “All distances are cumulative over time and given in metres.”

The data and associated information are intended for guidance only - it cannot provide details for individual properties.

The data shows areas of land likely to be at erosion risk but does not show the precise future position of the shoreline.

Erosion may happen faster or slower than what we show, and risk may change over time.

The Environment Agency’s warnings on its erosion map, from its description of the data ↗.

The coast and its plan, unit by unit · On the map

Protected nature

No Site of Special Scientific Interest, Special Area of Conservation, Local Nature Reserve, ancient woodland or country park is within about 100 m of Bexleigh Avenue’s line, and it is outside the High Weald National Landscape. Protected nature in Hastings

Flood zones: © Environment Agency copyright and/or database right 2025. Open Government Licence v3.0. Fetched 2026-10-12.

Coastal erosion and the Shoreline Management Plan: © Environment Agency copyright and/or database right 2025. © Environment Agency copyright and/or database right 2015. Open Government Licence v3.0. Fetched 2026-10-12.

Protected sites: © Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026. Open Government Licence v3.0. Fetched 2026-10-12.

Street lines © OpenStreetMap contributors.

Comments on the application

The council’s file counts 1 comment from the public: 1 objection, 0 in support (as it stood on Thu 15 Oct 2026).

Who the council consulted

The bodies and officers the file lists as consulted, with the day each was asked.

Consultee responses on the file

Responses filed as consultee comments, named as the file names them, with the day each was published. What they say is in each document on the council’s file.

Is a comment public?

The council’s page on commenting says: “All comments will be made available to view online and will be treated in accordance with our privacy policy. Comments will be redacted where they contain personal information or are inappropriate in their content.” It also says: “Please note that we do not accept anonymous comments.” Commenting on an application, on the council’s site ↗ (read 13 October 2026).

We count the comments on the council’s file. We never copy a commenter’s name, address or words, and we don’t list who objected: that is on the file.

Similar applications nearby

Other applications of the same kind (extensions and alterations) on Bexleigh Avenue or in West St Leonards ward, decided ones first, since our record starts on 21 April 2026. A refusal is marked; its reasons are in the decision notice on the council’s file. Each application is decided on its own facts.

Elsewhere in West St Leonards

…and 1 more of the same kind nearby. Every application on Bexleigh Avenue is on its page.

If you think work doesn’t match what was approved

The council’s planning enforcement team looks into building work or a use that may not have permission, or may not follow the approved plans or conditions. Its page explains how to report it and which cases it deals with first: planning enforcement on the council’s site ↗

Our planning record starts on 21 April 2026, from the council’s weekly lists of new and decided applications. We list the site, the proposal, the dates, the decision, the comment counts and a permission’s conditions. We never copy a commenter’s or an individual applicant’s details; an applicant is named only when it is an organisation we can match exactly to a council, a registered charity or a company on Companies House. Planning is decided by the council, not by us.