Land Rear of, 461-467 Bexhill Road
Planning application HS/FA/26/00165
Land Rear of, 461-467 Bexhill Road, (Amsterdam Way), St Leonards-on-sea
What is proposed
Erection of four semi-detached, single storey dwellings
Where it stands
- Reference: HS/FA/26/00165
- Street: Bexhill Road
- Ward: West St Leonards
- Validated: before our record starts on 21 April 2026, so we hold only its decision
- Applicant: ELPHICK DEVELOPMENTS LIMITED (Companies House 09610873 ↗)
- Decision: Granted permission, in the week of Mon 10 Aug 2026
Conditions attached
- Time limit to start
The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
- Built to the approved plans
The development hereby permitted shall be carried out in accordance with the following approved plans: 137-23-400A, 137-25-401B, C10500 - A, C10501 A, C10551 - A, J68.86/02.
- Biodiversity and ecology
No development works shall take place (including any ground works/vegetation clearance), until a Precautionary Works Method Statement detailing precautionary mitigation measures has been submitted to, and approved in writing by, the local planning authority. The content of the Statement will include: • The objectives for the proposed precautionary mitigation works, • The extent and location of proposed mitigation works shown on appropriate scale plans, • Proposed timing of mitigation measures in alignment with the development timetable, • Proposed sensitive working methods, such as a precautionary approach to pruning of trees with regard to potential for roosting bats and breeding birds, • Contingency plans should a protected species be encountered during works, • Details of those responsible for implementing the precautionary mitigation. The works shall be carried out in accordance with the approved details for the full duration of the construction period.
- Trees and landscaping
No development shall take place until temporary tree protection measures as highlighted on drawing J68.86/02 included in the Arboricultural Implications Assessment (Broad Oak Tree Consultants Limited - July 2026) have been provided on site in accordance with the current BS5837:2012: Trees in relation to design, demolition and construction, standards and to the satisfaction of the Local Planning Authority. All such tree protection measures shall be kept in a sound, upright and complete condition until the development has been completed and/or the Local Planning Authority confirm in writing that the works have been sufficiently completed for removal of the tree protection measures.
- Construction management
Prior to commencement of development a Construction Environmental Management Plan, to include a Dust Management Plan and mitigation measures, is to be submitted to, and approved in writing by, the Local Planning Authority. The approved Plan shall be adhered to throughout the construction period. The Plan shall provide for: a) An indicative programme for carrying out the works b) The arrangements for public consultation and liaison during the construction works c) Measures to minimise the noise (including vibration) generated by the construction process to include hours of work, proposed method of piling for foundations, the careful selection of plant and machinery and use of noise mitigation barrier(s) d) Details of any flood lighting, including location, height, type and direction of light sources and intensity of illumination e) the parking of vehicles of site operatives and visitors f) loading and unloading of plant and materials g) storage of plant and materials used in constructing the development h) the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate i) wheel washing facilities j) measures to control the emission of dust and dirt during construction in accordance with the control of dust and emissions during construction and demolition best practice guidance 2006 k) a scheme for recycling/disposing of waste resulting from construction works
- Noise, plant and smells
Prior to commencement of development, details, including acoustic specifications, of all fixed plant machinery and equipment associated with air moving equipment (including heat pumps, fans, ducting and external openings) installed within the site, which have the potential to cause noise disturbance to any noise sensitive receptors, shall be submitted in writing to and approved by the Local Planning Authority. The development shall be implemented in accordance with the approved details and shall thereafter be retained as approved.
- Biodiversity and ecology
(i) Prior to any works above slab level, a soft landscaping and Biodiversity Enhancement Plan is to be submitted to and approved in writing by the local planning authority. These details shall include, · A Landscaping Pan which includes native-species appropriate to the site's geography and the proximity of the Bulverhythe Shingle Beach and Cliffs Local Wildlife Site. · Schedules of plants, noting species, plant sizes and proposed numbers/densities where appropriate together with an implementation programme. · Building-integrated features for breeding birds, bats and/or invertebrates. · A long-term management of any public areas of the site. (ii) The development shall then be carried out in accordance with the approved details with all planting seeding or turfing comprised in the approved soft landscaping and biodiversity enhancement plan being completed prior to the occupation of any part of the development, or with the written agreement of the Local Planning Authority, in the first planting and seeding seasons following the occupation of any buildings or the completion of the development, whichever is the sooner. (iii) Any trees or plants which within a period of 5 years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species, unless the Local Planning Authority gives written consent to any variation.
- Trees and landscaping
(i) Prior to any works above slab level, full details of the hard landscape works are to be submitted to and approved in writing by the Local Planning Authority. These details shall include proposed finished levels or contours; means of enclosure; car parking layouts; other vehicle and pedestrian access and circulation areas; hard surfacing materials; minor artefacts and structures (eg refuse or other storage units, lighting etc.); proposed and existing functional services above and below ground (eg drainage, power, communications cables, pipelines etc. indicating lines, manholes, supports etc.); (ii) All hard landscape works shall be carried out in accordance with the approved details. The works shall be carried out prior to the occupation of any part of the development or in accordance with the programme agreed with the Local Planning Authority.
- Drainage and flooding
The development hereby approved shall be carried out in accordance with the Drainage Construction Plan C10551-A, Drainage Specification Notes C10500-A, Drainage Layout C10501-A and the submitted Flood Risk Assessment, ref. 12/06/2026, 25-0453, compiled by BdR, with the following mitigation measures incorporated into the scheme: · Finished floor levels shall be set no lower than 4.48 metres above Ordnance Datum (AOD); · Prior to the first occupation of each dwelling, written flood warning and evacuation information, including details of how to sign up to the Environment Agency flood warning service, shall be provided to the occupiers of that dwelling and retained within the homeowner information pack. The proposed drainage installation and required mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The drainage and flood mitigation measures detailed above shall thereafter be retained and maintained throughout the lifetime of the development.
- Biodiversity and ecology
Prior to the installation of any external lighting, a Lighting Design Plan for biodiversity shall be submitted to, and approved in writing by, the local planning authority. The plan shall show the type and locations of external lighting, demonstrating that areas to be lit will not adversely impact biodiversity. All external lighting shall be installed in accordance with the specifications and locations set out in the plan and maintained thereafter.
- Biodiversity and ecology
The development hereby approved shall be carried out in accordance with the ecological mitigation and enhancement measures set out in the Preliminary Ecological Appraisal prepared by FutureNature Consulting, dated September 2025, except where superseded by details approved under Conditions 3, 7 and 10.
- Trees and landscaping
All Arboricultural works shall be carried out in accordance with the details contained in the Arboricultural Implications Assessment (Broad Oak Tree Consultants Limited - July 2026) as already submitted with the planning application and agreed in principle with the local planning authority prior to determination.
- Parking, access and cycles
(i) The development hereby approved shall not be occupied until the car parking spaces and turning area have been constructed and provided in accordance with plan 137-25-401B. The areas shall thereafter be retained for that use and shall not be used for any purpose other than the parking and turning of vehicles. (ii) Car parking spaces shall measure 2.5m by 5m (with an extra 50cm on either dimension when the parking space is located adjacent to a wall or fence).
- Parking, access and cycles
Prior to occupation of the development hereby approved, details of cycle storage shall be submitted to and approved in writing by the Planning Authority. The cycle storage shall then be provided on site prior to occupation and be retained thereafter for that use and shall not be used other than for the parking of cycles.
- Bins and recycling
Prior to occupation of the development hereby approved, details of bin storage shall be submitted to and approved in writing by the Planning Authority. The bin storage shall then be provided on site prior to occupation and be retained thereafter for that use and shall not be used other than for the storage of bins.
- Parking, access and cycles
Each individual dwelling hereby approved shall not be occupied until a minimum of one electric vehicle charging point has been installed at each of the houses which have dedicated 'on plot' parking. The electric vehicle charging point shall thereafter be retained for that purpose.
- Materials and design details
The materials used in the construction of the development hereby approved shall be in accordance with those listed in the Schedule of Materials shown on plan 137-23-400A unless otherwise approved in writing by the local planning authority.
- Contaminated land
(i) In the event that contamination is found at any time when carrying out the proposed development, that was not previously identified, (such as asbestos containing material) works shall cease immediately on site and a scheme of proposed remediation measures must be submitted to and approved in writing to the Local Planning Authority for approval prior to continuation of the works. Works shall not recommence on site until the remediation scheme has been submitted to and approved by the Local Planning Authority in writing. (ii) Once the remediation scheme is approved by the Local Planning Authority, all the measures required within the approved remediation scheme shall be carried out. (iii) In the event that contamination is found to be present, upon completion of the works the developer shall provide written confirmation (verification report) that all works were completed in accordance with the agreed remediation details, this to be approved in writing by the Local Planning Authority.
- Hours of building work
Work which is audible at the site boundary and deliveries to and from the premises, during construction, shall not take place before 08:00 and after 18:00 hours Monday-Friday or before 09:00 and after 13:00 on Saturdays and at no time on Sundays or Bank Holidays.
- Something else
No waste shall be burned on site at any time.
- Permitted development rights removed
Notwithstanding the provisions of the Town and Country Planning [General Permitted Development] Order 2015 (or any order revoking and re-enacting that Order with or without modification), no extensions or alterations to the roofs of the dwellings, hereby approved, permitted by Classes AA, B & C of Part 1 of Schedule 2 or AC of Part 20 of Schedule 2 of the Order shall be carried out without the prior written consent of the Local Planning Authority.
Conservation and heritage on this street
- Bexhill Road runs along the edge of the Grosvenor Gardens conservation area ↗ (designated June 1990).
Flood zones, the coast and protected nature on this street
Flood zones
Part of Bexhill Road is in Flood Zone 3 (rivers and the sea). Part of it is in Flood Zone 2 (rivers and the sea). That is the Environment Agency’s flood map for planning, which shows land that could flood from rivers or the sea, ignoring the benefits of any existing flood defences.
Locations in flood zone 3 have a high probability of flooding.
This means, in any year, land has:
- a 1% (1 in 100) or more chance of flooding from rivers
- a 0.5% (1 in 200) or more chance of flooding from the sea.
Flood zone 3 developments need a flood risk assessment as part of their planning application.
Locations in flood zone 2 have a medium probability of flooding.
This means, in any year, land has:
- between a 1% and 0.1% (between 1 in 100 and 1 in 1,000) chance of flooding from rivers
- between a 0.5% and 0.1% (between 1 in 200 and 1 in 1,000) chance of flooding from the sea.
Flood zone 2 developments need a flood risk assessment as part of their planning application.
The coast
The Environment Agency’s erosion map covers this frontage: 4 stretches of policy unit 4C25 Bulverhythe and Glyne Gap ↗ in the Shoreline Management Plan, whose policy is Hold the line (Maintain/replace) in all three periods, 2005 to 2105: “Where protection is currently provided by coastal defence structures or managed beaches, and the intention is to retain a defence along approximately the current alignment. This will involve replacing defences when needed. Defence type, method and standard of protection may be modified over time.”
- With Shoreline Management Plans delivered: 0 m by 2055, 0 m by 2105.
- No Future Intervention: 11 to 50 m by 2055, 31 to 126 m by 2105.
Part of Bexhill Road’s line is inside the map’s No Future Intervention zone to 2105, and none of it inside the zone to 2105 with the plan delivered.
The data and associated information are intended for guidance only - it cannot provide details for individual properties.
The data shows areas of land likely to be at erosion risk but does not show the precise future position of the shoreline.
Erosion may happen faster or slower than what we show, and risk may change over time.
Protected nature
Comments on the application
Who the council consulted
- Refuse Storage - Leisure & Amenities, asked Wed 15 Apr 2026
- Highways, asked Wed 15 Apr 2026
- HBC Senior SUDS and Flood Risk Officer, asked Mon 15 Jun 2026
- Southern Water, asked Mon 15 Jun 2026
- NRAK - Environment Agency, asked Mon 15 Jun 2026
- County Ecologist, asked Wed 15 Apr 2026
- Environmental Health - Contaminated Land only, asked Wed 15 Apr 2026
- West St Leonards Neighbourhood Forum, asked Wed 15 Apr 2026
- Ecology, asked Mon 29 Jun 2026
- Canopy IQ ltd., asked Mon 6 Jul 2026
Consultee responses on the file
- WASTE SERVICES, Mon 20 Apr 2026
- WASTE, Wed 22 Apr 2026
- SOUTHERN WATER, Wed 22 Apr 2026
- SOUTHERN WATER MAP, Wed 22 Apr 2026
- ENVIRONMENT AGENCY, Thu 23 Apr 2026
- HBC SENIOR SUDS AND FLOOD RISK OFFICER, Wed 29 Apr 2026
- HIGHWAYS, Fri 1 May 2026
- ENVIRONMENTAL HEALTH, Wed 6 May 2026
- SOUTHERN WATER, Mon 22 Jun 2026
- ENVIRONMENT AGENCY, Mon 29 Jun 2026
- SENIOR SUSTAINABLE URBAN DRAINAGE AND FLOOD RISK OFFICER, Tue 30 Jun 2026
- BOROUGH ARBORICULTURIST, Fri 17 Jul 2026
- ECOLOGY COMMENTS, Mon 20 Jul 2026
Is a comment public?
The council’s page on commenting says: “All comments will be made available to view online and will be treated in accordance with our privacy policy. Comments will be redacted where they contain personal information or are inappropriate in their content.” It also says: “Please note that we do not accept anonymous comments.” Commenting on an application, on the council’s site ↗ (read 13 October 2026).
We count the comments on the council’s file. We never copy a commenter’s name, address or words, and we don’t list who objected: that is on the file.
Similar applications nearby
Elsewhere in West St Leonards
- 195 Harley Shute Road
Erection of 2 no. detached new build dwellings with associated access, parking, landscaping and other works. Retrospective demolition of existing garage and connecting structure (amended description)
HS/FA/25/00678, validated Thu 9 Jul 2026
Registered