Greeba Court, Marina

Planning application HS/FA/26/00238

Greeba Court, Marina, St Leonards-on-sea, TN38 0BQ

Conditions, certificates and amendments This asks to change the conditions of a permission already granted.

What is proposed

In the council’s words, from its weekly list:

Variation of Condition 2 (Approved Plans) and 3 (Materials) of Planning Permission HS/FA/25/00723… cut short in the council’s list; the full wording is on its file

Where it stands

The council’s file ↗

Conditions attached

The decision notice on the council’s file (published Thu 2 Jul 2026) attaches 5 conditions. In the council’s words, each with the reason it gives:

  1. Time limit to start
    The development hereby permitted shall be begun before 30/01/2029 being the expiration date of planning permission HS/FA/25/0723.

    Reason: This condition is imposed in accordance with the provisions of Section 91 of the Town and Country Planning Act 1990.

  2. Built to the approved plans
    The development hereby permitted shall be carried out in accordance with the following approved plans: 36264-BPG-01-ZZ-D-A-405 [name removed] D-A-0100 P01 D-A-0201 P01 D-A-0311 P01 D-A-0312 P01 D-A-0313 P01 D-A-0314 P01 D-A-0315 P01 D-A-0316 P01 D-A-0317 P01 D-A-0318 P01 D-A-0319 P01 D-A-0320 P01 D-A-0406 P01 D-A-0407 P01

    Reason: For the avoidance of doubt and in the interests of proper planning.

  3. Materials and design details
    The materials to be used in the construction of the external surfaces of the development hereby permitted shall be in accordance with materials noted on drawing number 36264-BPG-01-ZZ-D-A-405 [name removed]. The approved materials used in connection with the development shall thereafter be retained.

    Reason: In order to protect the visual amenities of the area and to secure a well planned development

  4. Materials and design details
    All new external works of making good to the retained fabric, must match the existing, adjacent work in respect of materials, detailed execution and finished appearance, unless otherwise approved in writing by the Local Planning Authority

    Reason: In order to preserve the character and appearance of the conservation area and the setting of a listed building.

  5. Hours of building work
    With the exception of internal works the building works required to carry out the development allowed by this permission must only be carried out within the following times:- 08.00 - 18.00 Monday to Friday 08.00 - 13.00 on Saturdays No working on Sundays or Public Holidays.

    Reason: To safeguard the amenity of adjoining and future residents.

We copy the numbered conditions and their reasons and nothing else from the notice; its notes to the applicant are on the file. The label on each is ours, by rules on the council’s wording. The conditions the council attaches, by kind of application

Conservation and heritage on this street

We couldn’t place Greeba Court’s line on the map, so we can’t say whether it reaches a conservation area. The town’s conservation areas lists each one with the council’s map.

The council’s Article 4 direction on houses in multiple occupation covers the whole town (in force since 2 July 2012): turning a house into a shared house for three to six people needs planning permission. The council’s page ↗

Conservation areas, Article 4 directions and tree preservation orders: Hastings Borough Council, Open Government Licence v3.0. Street lines © OpenStreetMap contributors.

Flood zones, the coast and protected nature on this street

We place an application by the street in its address, so these say where Greeba Court runs, not where the site’s boundary is. The application’s own documents on the council’s file show the site.

Flood zones

Greeba Court has no line on our map, so we can’t say which flood zone it is in.

A street’s line is not an address. For a particular address, use the Environment Agency’s Check your long term flood risk ↗; for a planning site, its Flood map for planning ↗. Flood warnings in force now are on Live now.

Flood zones: © Environment Agency copyright and/or database right 2025. Open Government Licence v3.0. Fetched 2026-10-12.

Coastal erosion and the Shoreline Management Plan: © Environment Agency copyright and/or database right 2025. © Environment Agency copyright and/or database right 2015. Open Government Licence v3.0. Fetched 2026-10-12.

Protected sites: © Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026. Open Government Licence v3.0. Fetched 2026-10-12.

Street lines © OpenStreetMap contributors.

Comments on the application

The council’s file counts no comments from the public (as it stood on Thu 15 Oct 2026).

Who the council consulted

The bodies and officers the file lists as consulted, with the day each was asked.

Consultee responses on the file

Responses filed as consultee comments, named as the file names them, with the day each was published. What they say is in each document on the council’s file.

Is a comment public?

The council’s page on commenting says: “All comments will be made available to view online and will be treated in accordance with our privacy policy. Comments will be redacted where they contain personal information or are inappropriate in their content.” It also says: “Please note that we do not accept anonymous comments.” Commenting on an application, on the council’s site ↗ (read 13 October 2026).

We count the comments on the council’s file. We never copy a commenter’s name, address or words, and we don’t list who objected: that is on the file.

If you think work doesn’t match what was approved

The council’s planning enforcement team looks into building work or a use that may not have permission, or may not follow the approved plans or conditions. Its page explains how to report it and which cases it deals with first: planning enforcement on the council’s site ↗

Our planning record starts on 21 April 2026, from the council’s weekly lists of new and decided applications. We list the site, the proposal, the dates, the decision, the comment counts and a permission’s conditions. We never copy a commenter’s or an individual applicant’s details; an applicant is named only when it is an organisation we can match exactly to a council, a registered charity or a company on Companies House. Planning is decided by the council, not by us.