Adelaide House, 23 Grand Parade

Planning application HS/LB/26/00494

Adelaide House, 23 Grand Parade, St Leonards-on-sea, TN37 6DN

Listed buildings This asks for listed building consent to work on a listed building.

What is proposed

In the council’s words, from its weekly list:

Installation of lead flashing to front elevation cornice

Where it stands

The council’s file ↗

The decision notice on the council’s file sets out any conditions attached to a permission, or the reasons for a refusal. Read it on the file, under Documents.

Conservation and heritage on this street

Measured along the street’s line against the council’s boundaries. Whether a particular building is inside depends on where the boundary runs: each area’s page on the council’s site has its map. All 18 conservation areas

The council’s Article 4 direction on houses in multiple occupation covers the whole town (in force since 2 July 2012): turning a house into a shared house for three to six people needs planning permission. The council’s page ↗

2 listed buildings are on or beside Grand Parade: the street’s page lists them.

Conservation areas, Article 4 directions and tree preservation orders: Hastings Borough Council, Open Government Licence v3.0. Street lines © OpenStreetMap contributors. Listed buildings: © Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026.

Flood zones, the coast and protected nature on this street

We place an application by the street in its address, so these say where Grand Parade runs, not where the site’s boundary is. The application’s own documents on the council’s file show the site.

Flood zones

None of Grand Parade’s line is in Flood Zone 2 or 3 on the Environment Agency’s flood map for planning. In the Agency’s words: “This means a site in flood zone 1 could still flood now or in the future.”

A street’s line is not an address. For a particular address, use the Environment Agency’s Check your long term flood risk ↗; for a planning site, its Flood map for planning ↗. Flood warnings in force now are on Live now.

The coast

The Environment Agency’s erosion map covers this frontage: 2 stretches of policy unit 4C24 Hastings (inc. the Harbour) ↗ in the Shoreline Management Plan, whose policy is Hold the line (Maintain/replace) in all three periods, 2005 to 2105: “Where protection is currently provided by coastal defence structures or managed beaches, and the intention is to retain a defence along approximately the current alignment. This will involve replacing defences when needed. Defence type, method and standard of protection may be modified over time.”

All of Grand Parade’s line is inside the map’s No Future Intervention zone to 2105, and none of it inside the zone to 2105 with the plan delivered.

The figures are the width of the map’s erosion zone, inland from today’s shoreline, on the Higher Central allowance. In the Agency’s words: “Two periods: Medium Term (up to 2055) and Long Term (up to 2105).” “Two management scenarios: With Shoreline Management Plans delivered and No Future Intervention.” “Three climate scenarios: Present Day climate (2020), Higher Central allowance and Upper End allowance. The two allowances use sea level rise data from UKCP18 RCP8.5 70th and 95th percentiles respectively.” “All distances are cumulative over time and given in metres.”

The data and associated information are intended for guidance only - it cannot provide details for individual properties.

The data shows areas of land likely to be at erosion risk but does not show the precise future position of the shoreline.

Erosion may happen faster or slower than what we show, and risk may change over time.

The Environment Agency’s warnings on its erosion map, from its description of the data ↗.

The coast and its plan, unit by unit · On the map

Protected nature

No Site of Special Scientific Interest, Special Area of Conservation, Local Nature Reserve, ancient woodland or country park is within about 100 m of Grand Parade’s line, and it is outside the High Weald National Landscape. Protected nature in Hastings

Flood zones: © Environment Agency copyright and/or database right 2025. Open Government Licence v3.0. Fetched 2026-10-12.

Coastal erosion and the Shoreline Management Plan: © Environment Agency copyright and/or database right 2025. © Environment Agency copyright and/or database right 2015. Open Government Licence v3.0. Fetched 2026-10-12.

Protected sites: © Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026. Open Government Licence v3.0. Fetched 2026-10-12.

Street lines © OpenStreetMap contributors.

Comments on the application

The council’s file counts no comments from the public (as it stood on Thu 22 Oct 2026).

Who the council consulted

The bodies and officers the file lists as consulted, with the day each was asked.

Consultee responses on the file

Responses filed as consultee comments, named as the file names them, with the day each was published. What they say is in each document on the council’s file.

Is a comment public?

The council’s page on commenting says: “All comments will be made available to view online and will be treated in accordance with our privacy policy. Comments will be redacted where they contain personal information or are inappropriate in their content.” It also says: “Please note that we do not accept anonymous comments.” Commenting on an application, on the council’s site ↗ (read 13 October 2026).

We count the comments on the council’s file. We never copy a commenter’s name, address or words, and we don’t list who objected: that is on the file.

Similar applications nearby

Other applications of the same kind (listed buildings) on Grand Parade or in Central St Leonards ward, decided ones first, since our record starts on 21 April 2026. A refusal is marked; its reasons are in the decision notice on the council’s file. Each application is decided on its own facts.

On Grand Parade

Elsewhere in Central St Leonards

If you think work doesn’t match what was approved

The council’s planning enforcement team looks into building work or a use that may not have permission, or may not follow the approved plans or conditions. Its page explains how to report it and which cases it deals with first: planning enforcement on the council’s site ↗

Our planning record starts on 21 April 2026, from the council’s weekly lists of new and decided applications. We list the site, the proposal, the dates, the decision, the comment counts and a permission’s conditions. We never copy a commenter’s or an individual applicant’s details; an applicant is named only when it is an organisation we can match exactly to a council, a registered charity or a company on Companies House. Planning is decided by the council, not by us.