24 Hollington Park Road
Planning application HS/FA/25/00530
24 Hollington Park Road, St Leonards-on-sea, TN38 0SG
What is proposed
Demolition of existing 4 bedroom dwelling and construction of new Self-Build 4 bedroom dwelling a… cut short in the council’s list; the full wording is on its file
Where it stands
- Reference: HS/FA/25/00530
- Street: Hollington Park Road
- Ward: Maze Hill
- Validated: before our record starts on 21 April 2026, so we hold only its decision
- Decision: Granted permission, in the week of Mon 1 Jun 2026
Conditions attached
- Time limit to start
The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
- Built to the approved plans
The development hereby permitted shall be carried out in accordance with the following approved plans: 24.642/03D, 24.642/04B, 24.642/05D, 24.642/09B, 24.642/10B, 24.642/11, 24.642/17A, Drainage strategy report (ref: 25033-RP-D-2600-S4-P01, dated 17 December 2025), amended drainage layout (ref: 25033 DR-D 2200-S4 P02, dated 12 December 2025) and drainage details (ref: 25033 CA-D-2220-S4 P01 and 25033 CA-D-2221-S4 P01, dated 17 December 2025), Updated Arboricultural Report (March 2026) and Arboricultural Report (September 2025) produced by The Mayhew Consultancy, Tree Replacement Plan/Statement (March 2026), Preliminary Ecological Appraisal (June 2025) produced by JWK Wildlife Surveys, Sustainability Statement (April 2026).
- Parking, access and cycles
No construction or demolition work shall start until a Method Statement has been submitted to, and approved in writing by, the Local Planning Authority. Demolition and construction work shall only take place in accordance with the approved method statement which shall include: · measures to control the emission of dust and dirt generated by demolition and construction works, including measures to prevent mud on the highway; · a scheme for controlling noise and vibration from demolition and construction activities [including details of any piling]; · the arrangements for deliveries associated with all construction works, loading/ unloading of plant & materials and their storage and restoration of any damage to the highway [including vehicle crossovers and grass verges]. At no point are materials or equipment associated with the development to be stored in such a manner that causes obstruction to the vehicular access to the property 'Val Mascal'. Similarly, at no point are vehicles including deliveries, collections or unloading associated with the development hereby approved obstruct the vehicular access to the property, ‘Val Mascal’.
- Something else
Prior to commencement of development, the following details are to be submitted to and approved in writing by the Local Planning Authority, (i) Confirmation of retaining wall heights within dimensioned and topographically accurate engineering drawings. (ii) Ground conditions data and geotechnical parameters based on an appropriate intrusive site investigation. (iii) Retaining wall designs based on the site investigation data. (iv) Slope stability calculations based on the site investigation data. Development shall then be carried out in accordance with the approved details.
- Trees and landscaping
Prior to commencement of development the measures outlined in the submitted Updated Arboricultural Report (March 2026) and Arboricultural Report (September 2025) produced by The Mayhew Consultancy must be fully implemented unless the scheme(s), or programme(s) of measures contained within the reports is otherwise first varied, by way of prior written approval from the Local Planning Authority. All temporary protective fences to safeguard the trees and/or hedges to be retained on the site must be erected in accordance with the current BSI 5837 standards: Trees in relation to design, demolition and construction - Recommendations. and to the satisfaction of the Local Planning Authority. All such fences shall be kept in a sound, upright and complete condition until the development has been completed and/or the Local Planning Authority confirm in writing that the works have been sufficiently completed for the fencing to be removed.
- Trees and landscaping
(i) All planting, tree planting, seeding or turfing as shown on the Tree Replacement Plan/Statement (March 2026) shall be carried out prior to the occupation of any part of the development, or with the written agreement of the Local Planning Authority, in the first planting and seeding seasons following the occupation of any buildings or the completion of the development, whichever is the sooner. (ii) If within a period of five years from the date of the planting of any tree, or any tree planted in replacement for it, is removed, uprooted or destroyed or dies, or becomes, in the opinion of the Local Planning Authority, seriously damaged or defective, another tree of the same species and size as that originally planted shall be planted at the same location. (iii) All trees produced abroad but purchased for transplanting shall spend at least one full growing season on a UK nursery and be subjected to a pest and disease control programme. Evidence of this control programme, together with an audit trail of when imported trees where needed and their origin and how long they have been in the nursery will be supplied in writing to the Local Planning Authority prior to the commencement of any tree planting.
- Biodiversity and ecology
The development hereby approved shall be carried out in accordance with the Preliminary Ecological Appraisal (June 2025) produced by JWK Wildlife Surveys and all its requirements and recommendations shall be implemented and adhered to in full throughout the entire construction period.
- Biodiversity and ecology
Prior to occupation of the dwelling hereby approved evidence of the installation of the following ecological enhancements on site is to be submitted to and approved in writing by the Local Planning Authority, · 3No. bird boxes, ideally Schwegler 2m or 1b boxes or Vivara open nest box. The boxes should be positioned at least 2m high facing between north and east, · 2No. bat boxes, ideally Schwegler 2F boxes or the Schwegler 1 FQ. The boxes should be oriented south-west to south-east and ideally located directly below the eaves. · 1 No. invertebrate brick/box, and · Hedgehog holes in any hard boundary features These ecological enhancements shall then be retained on site for the perpetuity of the development.
- Drainage and flooding
Prior to commencement of development, the following details are to be submitted to and approved in writing by the Local Planning Authority i. amended hydraulic calculation: The node annotation used in the hydraulic calculation should be consistent with that used in the drainage layout to improve understanding of the simulation results. However, the node annotation used in the hydraulic calculation differs from that used in the submitted amended drainage layout. Therefore, an amended hydraulic calculation that reflects the drainage layout annotations is required. ii. Evidence that Southern Water has agreed to discharge surface water runoff into the public sewer system. Surface water runoff from the proposed development should be limited to the existing runoff close to greenfield runoff rates for all rainfall events, including those with a 1 in 100 (plus climate change) annual probability of occurrence. Development shall then be carried out in accordance with the amended hydraulic calculation along side the following, Drainage strategy report (ref: 25033-RP-D-2600-S4-P01, dated 17 December 2025), Amended drainage layout (ref: 25033 DR-D 2200-S4 P02, dated 12 December 2025), and drainage details (ref: 25033 CA-D-2220-S4 P01 and 25033 CA-D-2221-S4 P01, dated 17 December 2025).
- Trees and landscaping
All hard landscape works shall be carried out in accordance with Plan 24.642/09B unless otherwise approved in writing by the Local Planning Authority. The works shall be carried out prior to the occupation of any part of the development or in accordance with the programme agreed with the Local Planning Authority.
- Parking, access and cycles
Prior to occupation of the dwelling hereby approved, details of cycle storage must be submitted to and approved in writing by the Local Planning Authority. The cycle storage shall then be erected in accordance with the approved details prior to occupation and thereafter retained and maintained.
- Bins and recycling
Prior to occupation of the dwelling hereby approved details of a bin store must be submitted and approved in writing by the Local Planning Authority. Bin stores should be discreetly located and suitably enclosed. The bin stores shall then be erected in accordance with the approved details prior to occupation and thereafter retained and maintained.
- Materials and design details
No development shall take place above ground until details of the materials to be used in the construction of the external surfaces of the dwelling and garage hereby permitted have been submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details.
- Windows, balconies and privacy
Prior to occupation of the dwelling hereby approved the bathroom windows in the front and rear elevations shall be fitted with obscure glass to a minimum level of obscurity equivalent to Pilkington Texture Glass Level 3, or similar equivalent and be permanently fixed shut and non-opening below 1.7 metres from finished floor level. The obscure glazing shall thereafter be retained for the perpetuity of the development.
- Something else
The development hereby approved shall be carried out in accordance with the Sustainability Statement (April 2026).
- Parking, access and cycles
The dwelling hereby approved shall not be occupied until a minimum of one electric vehicle charging point has been installed on site. The electric vehicle charging point shall thereafter be retained for that purpose.
Conservation and heritage on this street
None of the town’s 18 conservation areas reaches Hollington Park Road as mapped.
Tree preservation orders within about 40 m of Hollington Park Road’s line, from the council’s map data:
- TPO 11: made 12 April 1950, confirmed 19 June 1950; 29 groups of trees, 10 woodlands in the order. The order (PDF) ↗
- TPO 57: made 2 November 1973, confirmed 4 March 1974; 10 trees, 4 groups of trees in the order. The order (PDF) ↗
- TPO 70: made 10 March 1976, confirmed 15 June 1976; 9 trees in the order. The order (PDF) ↗
- TPO 96: made 3 February 1987, confirmed 28 July 1987; 1 group of trees in the order. The order (PDF) ↗
- TPO 98: made 2 July 1987, confirmed 4 September 1987; 13 trees in the order. The order (PDF) ↗
- TPO 101: made 3 September 1987, confirmed 25 November 1987; 1 tree in the order. The order (PDF) ↗
- TPO 112a: made 18 October 1989, confirmed 12 December 1989; 4 trees in the order. The order (PDF) ↗
- TPO 124: made 26 January 1993, confirmed 27 May 1993; 16 trees, 3 areas of trees, 2 woodlands in the order. The order (PDF) ↗
- TPO 146: made 18 May 1993, confirmed 27 August 1993; 1 group of trees in the order. The order (PDF) ↗
- TPO 237a: made 5 July 2005, confirmed 16 January 2006; 13 trees, 6 groups of trees in the order. The order (PDF) ↗
- TPO 252: made 24 January 2007, confirmed 16 May 2007; 2 trees in the order. The order (PDF) ↗
Flood zones, the coast and protected nature on this street
Flood zones
None of Hollington Park Road’s line is in Flood Zone 2 or 3 on the Environment Agency’s flood map for planning. In the Agency’s words: “This means a site in flood zone 1 could still flood now or in the future.”
Protected nature
- Ponds Wood LNR ↗ (Local Nature Reserve): Hollington Park Road’s line passes within about 30 m of it.
- Ancient woodland: Hollington Park Road’s line passes within about 100 m of 1 parcel on Natural England’s inventory (Gillsmans Wood).
Comments on the application
Who the council consulted
- Refuse Storage - Leisure & Amenities, asked Fri 3 Oct 2025
- Nature Space, asked Fri 3 Oct 2025
- Environment and Natural Resources Manager (Ecology), asked Fri 3 Oct 2025
- BOROUGH ARBORICULTURIST, asked Wed 6 May 2026
- HBC Senior SUDS and Flood Risk Officer, asked Mon 22 Dec 2025
- Southern Water, asked Mon 22 Dec 2025
- Land Stability Review - Milvum Engineering Services Ltd
Consultee responses on the file
- SOUTHERN WATER LETTER, Tue 7 Oct 2025
- SOUTHERN WATER PLAN, Tue 7 Oct 2025
- WASTE, Wed 8 Oct 2025
- SUDS, Tue 21 Oct 2025
- NATURE SPACE, Thu 23 Oct 2025
- SOUTHERN WATER MAP, Mon 10 Nov 2025
- SOUTHERN WATER, Mon 10 Nov 2025
- SOUTHERN WATER MAP, Wed 19 Nov 2025
- SOUTHERN WATER, Wed 19 Nov 2025
- SENIOR SUSTAINABLE URBAN DRAINAGE AND FLOOD RISK OFFICER, Fri 21 Nov 2025
- SOUTHERN WATER MAP, Tue 2 Dec 2025
- FURTHER COMMENTS SOUTHERN WATER, Tue 2 Dec 2025
- LAND STABILITY REVIEW - MILVUM - DATED 02/12/2025, Mon 8 Dec 2025
- SOUTHERN WATER, Mon 5 Jan 2026
- SOUTHERN WATER MAP, Mon 5 Jan 2026
- HBC SENIOR SUDS AND FLOOD RISK OFFICER, Mon 12 Jan 2026
- BOROUGH ARBORICULTURIST, Wed 22 Apr 2026
- BOROUGH ARBORICULTURIST, Mon 11 May 2026
Is a comment public?
The council’s page on commenting says: “All comments will be made available to view online and will be treated in accordance with our privacy policy. Comments will be redacted where they contain personal information or are inappropriate in their content.” It also says: “Please note that we do not accept anonymous comments.” Commenting on an application, on the council’s site ↗ (read 13 October 2026).
We count the comments on the council’s file. We never copy a commenter’s name, address or words, and we don’t list who objected: that is on the file.
Similar applications nearby
Elsewhere in Maze Hill
- Land adjoining, 10 Branksome Road
Proposed detached Two Storey Dwelling
HS/FA/26/00142, decided in the week of Mon 14 Sep 2026
Granted permission