Land adjacent to 33 Nelson Road (rear of 133 Milward Road)
Planning application HS/FA/25/00741
Land adjacent to 33 Nelson Road (rear of 133 Milward Road), Hastings
What is proposed
Erection of 1, three-storey, three bed house
Where it stands
- Reference: HS/FA/25/00741
- Street: Milward Road
- Ward: Castle
- Validated: before our record starts on 21 April 2026, so we hold only its decision
- Decision: Granted permission, in the week of Mon 19 Oct 2026
Conditions attached
- Time limit to start
The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
- Built to the approved plans
The development hereby permitted shall be carried out in accordance with the following approved plans: 2403 10C, 2403 11B, 2403 12B, 2403 13B, 2403 15C, 2403 16B, 2403 17A, 2403 18C, 25037 [name removed] 1220 S4 P01
- Construction management
Prior to the commencement of development, a detailed land stability scheme (supplementary to the Supplementary Report, Phase 2 Site Investigation and Revised Construction Method Statement (Ref H3929, Issue 1, June 2026)) shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall be prepared by a suitably qualified and competent person and shall include: a) ground conditions data and geotechnical parameters, based on the results of a further appropriate intrusive ground investigation (boreholes should penetrate beyond the intended depth of any piles in accordance with current guidance, including insitu and laboratory geotechnical testing); b) detailed design calculations and drawings for the proposed foundations, retaining structures and associated stabilisation works, informed by the findings of the ground investigation; c) an assessment of slope stability during both the temporary construction phase and permanent condition, including consideration of the instability of adjoining land and structures, plant and material surcharges during construction, and changes in topography arising from the development; d) a final detailed construction method statement setting out the proposed sequence and methodology for excavation, piling and construction of retaining structures, including details of temporary works and propping, and details of measures for the management and control of groundwater and surface water during excavation and construction. The development shall thereafter be carried out in accordance with the approved details.
- Drainage and flooding
Prior to the commencement of development the proposed means of foul sewerage and surface water disposal must be submitted to and approved in writing by the Local Planning Authority in consultation with Southern Water. The works shall then be completed in accordance with the approved details.
- Drainage and flooding
Prior to the commencement of development, the following details of proposed surface water drainage system should be submitted to and approved in writing by the Local Planning Authority: i. Detailed drainage layout with supporting hydraulic calculations should be submitted. The drainage layout should show the piped layout and outfall with connections and invert levels. The hydraulic calculations should take into account the connectivity of the different surface water drainage features. ii. The Environment Agency's risk of surface water flooding maps shows an existing overland surface water flow route through the site from the east. Blocking the existing flow route may lead to increase surface water flood risk to the properties located east and south of the development site. The applicant should therefore provide information on how the proposed site layout affects the existing overland surface water flow route and the measures which will be taken to ensure that there is no increase to flood risk of neighbouring properties from this flow route. iii. information on how surface water flows exceeding the capacity of the surface water drainage features will be managed safely. The proposed surface water drainage system shall then be installed in accordance with the approved details and maintained and retained for the lifetime of the development.
- Trees and landscaping
Prior to the commencement of development, the developer must submit the landscaping proposals for approval in writing by the Local Planning Authority (in consultation with Southern Water). The landscaping shall then be planted in accordance with the approved details and maintained in accordance with the approved details for the lifetime of the development unless otherwise agreed in writing by the Local Planning Authority.
- Trees and landscaping
No development shall take place until there has been submitted to and approved by the Local Planning Authority a scheme of soft landscaping, which shall include indications of all existing trees and hedgerows on the land including details of those to be retained, together with measures for their protection in the course of development. New soft landscaping details shall include planting plans; written specifications (including cultivation and other operations associated with plant and grass establishment); schedules of plants, noting species, plant sizes and proposed numbers/densities where appropriate together with an implementation programme. The scheme of soft landscaping shall be implemented in accordance with the approved details prior to the occupation of the development.
- Biodiversity and ecology
No development shall take place until an ecological design strategy (EDS) addressing onsite ecological compensation and enhancement measures has been submitted to and approved in writing by the Local Planning Authority. The EDS shall include: i) details of soft landscaping of value to wildlife, comprising native species; ii) details, including specification and location, of 2 no. tree-mounted bird boxes within the site; iii) details, including specification and location, of integrated bird-brick boxes within the approved dwelling; iv) details, including specification and location, of 2 no. integrated bat boxes within the approved dwelling; and v) details of hedgehog gaps at the base of the existing and proposed fencing to provide connectivity through the site. The approved ecological compensation and enhancement measures shall be implemented in full in accordance with the approved details and, where applicable, prior to the first occupation of the dwelling hereby approved. The measures shall thereafter be retained and maintained in accordance with the approved details.
- Construction management
Prior to commencement of development including demolition, ground works and vegetation clearance (except that carried out with hand tools only as part of regular maintenance and tidying of the site) a Construction Environmental Management Plan (CEMP: Development) is to be submitted to, and approved in writing by, the Local Planning Authority. Thereafter the construction of the development shall then be carried out in accordance with BS5228 Noise Vibration and Control on Construction and Open Sites and The Control of Dust And Emissions From Construction And Demolition Best Practice Guidance unless previously agreed in writing by the Local Planning Authority. The approved Plan shall be adhered to throughout the construction period. The CEMP (Development) shall include the following: · Indicative programme for carrying out the works · Measures to minimise the production of dust on the site(s) · Measures to minimise the noise (including vibration) generated by the construction process to include the careful selection of plant and machinery and use of noise mitigation barrier(s) · Maximum noise levels expected 1 metre from the affected facade of any residential unit adjacent to the site(s) · Design and provision of site hoardings · Management of traffic visiting the site(s) including temporary parking or holding areas · Details of the arrangements for site-operative parking · Measures to prevent the transfer of mud and extraneous material onto the public highway · Measures to manage the production of waste and to maximise the re-use of materials · Measures to minimise the potential for pollution of groundwater and surface water · The location and design of site office(s) and storage compounds · The location of temporary vehicle access points to the site(s) during the construction works · The arrangements for public consultation and liaison during the construction works
- Materials and design details
No development shall take place above ground until details of the materials to be used in the construction of the external surfaces of the dwelling hereby permitted have been submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details.
- Drainage and flooding
Prior to occupation of the development, evidence (including photographs) should be submitted for approval in writing by the Local Planning Authority showing that the drainage system has been constructed as per the final agreed detailed drainage designs.
- Biodiversity and ecology
No development, including demolition, groundworks or vegetation clearance, shall commence until an updated badger survey has been undertaken by a suitably qualified ecologist and submitted to and approved in writing by the Local Planning Authority. The survey shall identify whether badgers or any active badger setts are present within or adjacent to the application site and shall specify any necessary mitigation, precautionary measures and working methods. The development shall thereafter be carried out in full accordance with the approved mitigation and precautionary measures and within any timescales specified in the approved survey.
- Parking, access and cycles
Prior to the first occupation of the dwelling hereby approved, details of the means to secure a minimum of 3 no. bicycles within the ground floor plant/utility room shown on approved drawing 2403/10C shall be submitted to and approved in writing by the Local Planning Authority. The submitted details shall include a floor plan depicting the location of the cycle parking within the plant/utility room along with details of the proposed cycle stands, racks, wall anchors or other secure locking facilities. The approved cycle parking facilities shall be fully installed and made available for use prior to the first occupation of the dwelling and shall thereafter be retained and maintained for the lifetime of the development.
- Bins and recycling
Prior to first occupation of the dwelling hereby approved, the brand and specification of the proposed bin store shall be submitted for approval in writing by the Local Planning Authority. The bin store shall be installed in the approved area on drawing no. 2403/10C prior to first occupation of the dwellings, and this area shall be maintained and retained for that use for the lifetime of the development and shall not be used for any purpose other than for the storage of bins.
- Windows, balconies and privacy
Prior to the first occupation of the dwelling hereby approved, the first floor window to the east side elevation (shown on drawing no. 2403/15C) shall be obscure-glazed and shall be non-opening below a height of 1.7m measured from the finished floor level of the room which it serves. The glass shall be maintained and retained in accordance with these details for the lifetime of the development.
- Biodiversity and ecology
Prior to the installation of any external lighting, a sensitive lighting strategy shall be submitted to and approved in writing by the Local Planning Authority. The strategy shall demonstrate how artificial lighting has been designed to avoid unacceptable impacts on foraging and commuting bats and shall include: i) the location, height and specification of all external lighting; ii) the predicted light spill across the site and its boundaries; iii) measures to minimise light spill iv) details of lighting controls, including timers, motion sensors and hours of operation, where applicable. The approved lighting scheme shall be implemented in full prior to the first occupation of the development and shall thereafter be maintained and retained as approved unless otherwise agreed in writing by the Local Planning Authority.
- Parking, access and cycles
The development shall not be occupied until the parking areas have been provided in accordance with drawing no. 2403/10C, and the areas shall thereafter be retained for the parking of vehicles only.
- Parking, access and cycles
The dwelling hereby approved shall not be occupied until a minimum of one electric vehicle charging point has been installed. The electric vehicle charging point shall thereafter be maintained and retained for the lifetime of the development unless otherwise agreed in writing by the Local Planning Authority.
- How the building or land is used
Prior to the first occupation of the dwelling hereby approved, the false windows to the side elevations (3 no. to the east; 2 no. to the west) and alternating course projecting bricks to the red brick wall at street level to the front elevation shall be implemented in accordance with drawing nos. 2403/15C and 2403/16B. Thereafter these elements shall be maintained and retained for the lifetime of the development.
- Trees and landscaping
Prior to the first occupation of the dwelling hereby approved, the planting beds to the front elevation and the climbing plants with steel cables to the wall surrounding the parking area shall be implemented in accordance with drawing no. 2403/15C. Thereafter these elements shall be maintained and retained for the lifetime of the development.
- Trees and landscaping
Where removal of vegetation, including trees, shrubs, hedgerows and brambles, takes place during bird nesting season (01 March to 31 August inclusive), if active nests, eggs or young birds are identified, no works shall take place within a 5m radius of the nest until the nest is no longer active and any young have fledged.
- Hours of building work
Work which is audible at the site boundary and deliveries to and from the premises, during construction, shall not take place before 08:00 and after 18:00 hours Monday-Friday or before 09:00 and after 13:00 on Saturdays and at no time on Sundays or Bank Holidays.
- Noise, plant and smells
Prior to first occupation of the development, details, including acoustic specifications of all fixed plant machinery and equipment associated with air moving equipment (including fans, ducting and external openings) compressors, generators or plant of a like kind, installed within the site, which has the potential to cause noise disturbance to any noise sensitive receivers, shall be submitted to and approved in writing by the Local Planning Authority before installation. The rating level of noise emitted from the use of this plant, machinery or equipment shall not exceed the background sound level when measured according to BS4142:2014, at any adjoining or nearby noise sensitive premises.
- Drainage and flooding
Prior to the installation of any external lighting such as flood lighting or security lighting, details of the provisions for the avoidance of 'spill Light' that is to say light that obtrudes beyond the area it was intended to light and into surrounding areas or onto surrounding properties must be is submitted for approval in writing by the Local Planning Authority. The lighting shall then be installed in accordance with the approved details.
- Biodiversity and ecology
From commencement of works (including site clearance), the following precautionary measures for the protection of protected reptiles and Section 41 priority species hedgehog will be implemented: · Backfilling of trenches and other excavations will be undertaken before nightfall, or a ramp will be left to allow any animals to easily exit; · All excavations and trenches will be checked each morning throughout the construction period and prior to infilling; · All temporarily stored building materials (that might act as temporary resting places) will be isolated from areas of dense vegetation and raised off the ground, e.g. on pallets. The above measures will be implemented until the completion of all site works.
Conservation and heritage on this street
- Milward Road runs along the edge of the Old Town conservation area ↗ (designated 1968).
The council’s street index lists these properties on Milward Road under Article 4 directions, which take away some building work that wouldn’t otherwise need planning permission:
Tree preservation orders within about 40 m of Milward Road’s line, from the council’s map data:
- TPO 317: made 25 May 2023, confirmed 19 June 2023; 2 trees in the order. The order (PDF) ↗
Flood zones, the coast and protected nature on this street
Flood zones
None of Milward Road’s line is in Flood Zone 2 or 3 on the Environment Agency’s flood map for planning. In the Agency’s words: “This means a site in flood zone 1 could still flood now or in the future.”
Protected nature
At the planning committee
Comments on the application
Who the council consulted
- HBC Senior SUDS and Flood Risk Officer, asked Mon 12 Jan 2026
- Southern Water, asked Fri 20 Feb 2026
- Refuse Storage - Leisure & Amenities, asked Mon 12 Jan 2026
- Environment and Natural Resources Manager (Ecology), asked Mon 12 Jan 2026
- SGN High Pressure Pipeline, asked Tue 13 Jan 2026
- UK Power Networks(Operations), asked Tue 13 Jan 2026
- ESCC Parking, asked Tue 13 Jan 2026
- Land Stability Review - Milvum Engineering Services Ltd
- County 106 contributions, asked Tue 1 Sep 2026
- HOUSING (Major Projects), asked Tue 1 Sep 2026
- Ecology, asked Wed 30 Sep 2026
Consultee responses on the file
- WASTE, Tue 13 Jan 2026
- UK POWER NETWORKS, Thu 15 Jan 2026
- SOUTHERN WATER, Fri 16 Jan 2026
- SOUTHERN WATER MAP, Fri 16 Jan 2026
- ESCC PARKING, Tue 20 Jan 2026
- SGN LETTER, Wed 21 Jan 2026
- SGN MAP, Wed 21 Jan 2026
- HBC SENIOR SUDS AND FLOOD RISK OFFICER, Tue 3 Feb 2026
- SOUTHERN WATER MAP, Tue 24 Feb 2026
- SOUTHERN WATER, Tue 24 Feb 2026
- LAND STABILITY REVIEW - MILVUM - DATED 13/02/26, Thu 26 Feb 2026
- LAND SUITABILITY REVIEW - MILVUM ENGINEERING SERVICES AUGUST 2026, Tue 11 Aug 2026
- ECOLOGY COMMENTS, Mon 5 Oct 2026
Is a comment public?
The council’s page on commenting says: “All comments will be made available to view online and will be treated in accordance with our privacy policy. Comments will be redacted where they contain personal information or are inappropriate in their content.” It also says: “Please note that we do not accept anonymous comments.” Commenting on an application, on the council’s site ↗ (read 13 October 2026).
We count the comments on the council’s file. We never copy a commenter’s name, address or words, and we don’t list who objected: that is on the file.